Results 1 to 2 of 2

Thread: BOM Template

  1. #1
    Join Date
    Dec 2008
    Posts
    6

    Default BOM Template

    How much leeway is given to teams for modifying the BOM template? We assume adding rows and subsystems is allowed, but may teams modify column widths, fonts, colors, etc?

    Second question, is the GDC actually expecting a complete and accurate accounting of weights on the robot that we already have assembled? At 3 weeks into the competition, disassembling the entire robot to weigh the various parts seems inefficient.

  2. #2
    Join Date
    Jan 2006
    Posts
    2,777

    Default Re: BOM Template

    Minor alterations of the BOM spreadsheet format (e.g. column widths, font sizes, etc) is permitted. Please do NOT alter the column sequence.

    The item weights in the BOM are indicated for the convenience of the team, so you may use this BOM sheet as one tool for tracking total ROBOT weight. Completion of the weight fields in the BOM is not required to pass inspection.

Thread Information

Users Browsing this Thread

There are currently 1 users browsing this thread. (0 members and 1 guests)

Similar Threads

  1. C++ 2010 Image Demo Template
    By vtsurf1 in forum Vision
    Replies: 0
    Last Post: 01-25-2010, 07:39 PM
  2. Replies: 0
    Last Post: 01-23-2010, 12:49 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •