Section 4.3.4, Budget Constraints, indicates that Kit of Parts items are not included in the total cost calculation for the robot. Can you clarify the quantity of KoP items that are allowed to be excluded?
For example, would a veteran team be allowed to exclude a quantity of items specific to the veteran KoP, or would it be the same quantity as a rookie team's KoP? (Example, 1 Spike relay or 2?) Or is the quantity not limited (for the cost calculation)?


Reply With Quote