A: Remember, according to FVC rules, all field tolerances are +/- 1 inch. Based on the vairability of materials and construction teams are instructed to design accordingly. During the GDC sample build the top of the bar was situated just under 33" from the top of the platform and just over 33" from the foam surface. However, all teams need to design and prepare with these 1-inch tolerances in mind.Originally Posted by Josh Adelson


