FIRST Forums  

Go Back   FIRST Forums > 2009 FRC Q&A - Lunacy > 2009 Q&A Responses > Section 8 - The Robot > Fabrication Schedule

Reply
 
Thread Tools
  #1  
Old 03-30-2009, 06:23 PM
FRC2635 FRC2635 is offline
Junior Member
 
Join Date: Dec 2008
Posts: 1
Default Shipping of Withholding Allowance to Nationals

We are shipping a second crate to nationals in Atlanta. Along with tools and other necessities we are shipping our teams 40 pound withholding allowance. Our question is how do we check in our withholding allowance if it is in the crate in the pit area when we arrive.

Team 2635
Reply With Quote
  #2  
Old 04-08-2009, 10:33 AM
GDC GDC is offline
Game Design Committee
 
Join Date: Jan 2006
Posts: 1,934
Default Re: Shipping of Withholding Allowance to Nationals

If the second crate was shipped at the same time, and to the same destination, as the primary crate containing your robot, then for this purpose it can be considered "shipped with the robot" and there is no problem.

If the second create was shipped at a later date, then we recommend that you set aside your Withholding Allowance items after they are unpacked and until your team is formally checked in. At the check-in, if there is any question about your Withholding Allowance it can be addressed, and inspected if necessary.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
40 LB Withholding Allowance clarification FRC39 Material Utilization & Parts Use Flowchart 1 02-23-2009 02:08 PM
Gearbox & Withholding Allowance FRC1511 Fabrication Schedule 1 02-20-2009 02:10 AM
Litmus test for COTS FRC1743 Material Utilization & Parts Use Flowchart 2 02-19-2009 05:25 PM
Withholding Allowance - Batteries FRC178 Fabrication Schedule 1 02-17-2009 11:16 PM
Withholding allowance FRC696 Material Utilization & Parts Use Flowchart 1 02-09-2009 09:23 PM


All times are GMT -4. The time now is 01:13 AM.


Powered by vBulletin® Version 3.7.4
Copyright ©2000 - 2009, Jelsoft Enterprises Ltd.