FIRST Forums  

Go Back   FIRST Forums > FRC Archive > 2011 FRC Q&A > Find the answers to your questions here > FRC Game Manual - Answers > Section 4 - The Robot

Reply
 
Thread Tools
  #1  
Old 02-25-2011, 11:12 AM
2011FRC2973 2011FRC2973 is offline
Junior Member
 
Join Date: Dec 2010
Posts: 12
Default PPE and Safety Devices External to the Robot

Relative to T25 and prior Q&A rulings on its scope:

1) I don't see anywhere that PPE such as gloves or safety devices such as special hooks/clamps are allowed to be used to lift, carry and place the robot on the field. Are these disallowed by T25?

2) If a "remove before flight" pin is used to constrain a preloaded spring as a safety device to prevent injury in case of premature deployment, can we leave it in until the robot is placed on the field, or must we remove it prior to entering the arena?

3) Relative to G59, may a part of the robot be used to remove the minibot from the tower if it stays within the 84 inch diameter allowable cylinder during use (for instance, a hook on a tether which is mounted inside the envelope), or is that considered special equipment?
Reply With Quote
  #2  
Old 03-15-2011, 02:34 PM
GDC GDC is offline
Game Design Committee
 
Join Date: Jan 2006
Posts: 2,781
Default Re: PPE and Safety Devices External to the Robot

1) No
2) Yes
3) No, that would be considered special equipment.
Reply With Quote
Reply


Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -4. The time now is 10:18 AM.


Powered by vBulletin® Version 3.8.7
Copyright ©2000 - 2013, vBulletin Solutions, Inc.